viernes, 24 de abril de 2015

Resume Second Partial


In this second stage, we made the structure and some of the electronics components of the project, including the H bridge and the mesh motor movement. Another progress that we have is the chronometer and the joint of the other mechanics parts for the structure.  

One of the principal changes that we made is the fact that we modified the structure design, previously the structure had a very complex design, because we realized that it needed so many motors and so many engine work to do a low-comfortable machine that only allowed one print per time. So, for this reason we made a more simplistic design that allows two prints per time with a more efficient mechanism and more friendly operation.


The progress is good until now, because we only have one process left to do, a process which we name “The pre- drying stage”. Later we will implement the control system which is already designed.